Designated 2023-07-07
Bourne
Bourne has the thinnest exposure of any designated town — two watersheds on its Buzzards Bay side. It also filed latest, in 2025.
What Bourne filed
| Watershed | Filing | Transmittal |
|---|---|---|
| Phinney's Harbor | Notice of Intent | 25-WP94-0001-APP |
| Megansett–Squeteague Harbor | Notice of Intent | 25-WP94-0001-APP |
What that means if you are selling
Every watershed in Bourne is covered by a filing, so the nitrogen upgrade requirement is suspended here. On the MassDEP disclosure form a seller in one of these watersheds would normally tick box 2 — in a Nitrogen Sensitive Area, not currently subject to an upgrade — and name the filing above.
If Bourne were to miss the milestones in its approved schedule, MassDEP could start the five-year upgrade clock, which would run to 8 July 2030. That has not happened. It is the reason this page carries a date and gets re-checked.
The requirement that applies either way
A passing Title 5 inspection is required before you transfer title anywhere in Massachusetts, and it is valid for two years — three if you have documented annual pumping. That is independent of anything on this page.
Your septic records
Bourne Board of Health holds septic records and Title 5 reports. If you are trying to establish that nitrogen-reducing technology was already installed — box 3 on the disclosure form — that installation date is what you need, and the Board of Health file is where it lives.
Filings from MassDEP watershed application table, 11 June 2026.
Get a Title 5 inspection quote
Tell us the property and what you need. We pass the request to licensed Title 5 system inspectors covering Bourne.