Designated 2023-07-07
Yarmouth
Yarmouth spans three designated watersheds and has a large stock of older homes on septic systems, particularly south of Route 28.
What Yarmouth filed
| Watershed | Filing | Transmittal |
|---|---|---|
| Lewis Bay | Notice of Intent | 23-WP94-0007-APP |
| Bass River | Notice of Intent | 23-WP94-0008-APP |
| Parkers River | Notice of Intent | 23-WP94-0006-APP |
What that means if you are selling
Every watershed in Yarmouth is covered by a filing, so the nitrogen upgrade requirement is suspended here. On the MassDEP disclosure form a seller in one of these watersheds would normally tick box 2 — in a Nitrogen Sensitive Area, not currently subject to an upgrade — and name the filing above.
If Yarmouth were to miss the milestones in its approved schedule, MassDEP could start the five-year upgrade clock, which would run to 8 July 2030. That has not happened. It is the reason this page carries a date and gets re-checked.
Watersheds shared with other towns
These cross town lines, and the neighbouring town did not always file the same way — so two properties in the same watershed can sit in different positions.
- Lewis Bay — also Barnstable (Permit application)
- Bass River — also Brewster (De Minimis application), Dennis (Notice of Intent)
The requirement that applies either way
A passing Title 5 inspection is required before you transfer title anywhere in Massachusetts, and it is valid for two years — three if you have documented annual pumping. That is independent of anything on this page.
Your septic records
Yarmouth Board of Health holds septic records and Title 5 reports. If you are trying to establish that nitrogen-reducing technology was already installed — box 3 on the disclosure form — that installation date is what you need, and the Board of Health file is where it lives.
Filings from MassDEP watershed application table, 11 June 2026.
Get a Title 5 inspection quote
Tell us the property and what you need. We pass the request to licensed Title 5 system inspectors covering Yarmouth.